top of page

Completed Projects

 Tiara Towers

“Smyth Engineering performed a Milestone Inspection as well as a Structural Integrity Reserve Study at this gorgeous 10.38-acre property with (2) towers and (146) total units”.
Client: Elliott Merrill Community Management

Bryn Mawr Towers

“Smyth Engineering performed a Milestone Inspection as well as a Structural Integrity Reserve Study at this stunning 14.09-acre property with (3) buildings and (156) total units”.
Client: Elliot Merrill Community Management

Golden Bay Club

“Smyth Engineering performed a Milestone Inspection as well as a Structural Integrity Reserve Study at this stunning 14.09-acre property with (3) buildings and (156) total units”.
Client: Miami Management

Old Port Cove Quay North

“Smyth Engineering performed a Milestone Inspection as well as a Structural Integrity Reserve Study at this spectacular 5.32-acre property with garden units and 13 story primary building structure with (178) total units. The property features covered parking, a state-of-the-art fitness center with saunas, a heated waterfront pool and a large social room with library."

Client: AKAM Property Management

The Gables of Vero Beach

thumbnail_2024-05-20-15-25-15-379.png

“Smyth Engineering performed a Milestone Inspection Phase I and Structural Integrity Reserve Study (SIRS) for this fabulous property consisting of (2) 5-story buildings with Forty-Six (46) total units and heated pool."
Client: Elliot Merrill Community Management

Marina Village Condominium Phase I and II

WhatsApp Image 2024-05-29 at 12.05.28 PM.jpeg

"Smyth Engineering performed a Milestone Inspection Phase I at this gorgeous property, including (10) buildings, (3) pools and docks."

Client: Marquis Association Management

Current Projects

Elm Gardens

“Smyth Engineering performed the 25-year building safety inspection at this (3) story (36) unit building. We also developed the plans and specification for the structural restoration of wood framed mansards by performing lateral bracing and retrofitting wood studs per section 1706.4 of the Florida Building Code – Existing. We are also the Engineer of Record for the upcoming concrete restoration project that includes replacement of deteriorated structural steel columns.”

Client: Avalon Property Management Services

The Wellington

“Smyth Engineering performed a Milestone Inspection as well as a Structural Integrity Reserve Study at this beautiful 1.94-acre property with (51) total units. Smyth Engineering is also the engineer of record (E.O.R.) for the upcoming $1,500,000 concrete restoration project.”

Client: Avalon Property Management Services

Old Port Cove Harbor Village

“Smyth Engineering performed a Milestone Inspection as well as a Structural Integrity Reserve Study at this beautiful 8.74-acre property with (12) buildings and (94) total units. Smyth Engineering is also the engineer of record (E.O.R.) for the ongoing $2,000,000 concrete restoration project”.

Client: Ocean Breeze Community Management

Winston House

Engineer of Record and Roof Consultant for $500,000 roof replacement job at Winston House

Client:  Avalon Property Management

369 NE Baker Road, Stuart, FL.jpg
bottom of page